University of MN Duluth Zero Contact Wind Turbine Installation

Purpose

Installation of a novel 5kw wind turbine on UMD campus.

Partners

Activities

The first step is to purchase and install the 5kw wind turbine. Next, a monitoring system will be set up to track the power produced and calculate efficiencies. Selected UMD faculty and students will then engage in research, through the Undergraduate Research Opportunities Program and Senior Design Projects, to advance the zero contact gearing system. Students will be trained to provide tours to the community and educate them about this new technology.

Outcomes

The project will determine and demonstrate the benefits of the zero gearing system. We will calculate turbine efficiency and carbon footprint, conduct an energy life-cycle analysis and document noise production.

Funding

$7,000

Leveraged resources

$55,500